Equipment Rental
Building and structure surveys

Calculated at 7,400 RUB per physical observation point (FOP) + travel + accommodation + per diem
According to SCiR-82, recording of microseisms by a three-component seismological monitoring station is calculated based on the number of physical observation points (FOPs), with an adjustment coefficient.
The cost of 1 physical observation point includes recording (2,900 RUB/FOP) and processing (4,500 RUB/FOP) — 7,400 RUB/FOP. The required number of observation points depends on the geometric characteristics of the structure and the required density of the observation grid (usually from 30 to 200).

Seismic monitoring of buildings and structures

Calculated at 120,000 RUB/month per observation point + travel + accommodation + per diem
The required number of observation points depends on the survey results, seismicity near the structure under investigation, and the task at hand (usually at least 2 per site). The time required to equip one observation point is from 2 hours. It depends on the availability of power connection points (AC 220 V or DC 12–24 V, up to 2 A) and the data transmission method (LTE, internal LAN).